Mallinson Sports Centre – Upgrade complete.
Location: Highgate, London
Client: Five Interiors
Planned Start: August 2021
L&K has installed new lighting as well as upgrading the emergency lighting power circuits, to emphasise a modern, stylish look throughout the Centre while also reducing electrical and maintenance costs.
![](http://lakltd.co.uk/wp-content/uploads/2021/11/LAK_highgate_29_10_010-1024x683.jpg)
![](http://lakltd.co.uk/wp-content/uploads/2021/11/LAK_highgate_29_10_008-1024x683.jpg)
![](http://lakltd.co.uk/wp-content/uploads/2021/11/LAK_highgate_29_10_002-1024x877.jpg)
![](http://lakltd.co.uk/wp-content/uploads/2021/11/LAK_highgate_29_10_001-1024x687.jpg)
![](http://lakltd.co.uk/wp-content/uploads/2021/11/LAK_highgate_29_10_011-1024x683.jpg)