We have recently completed our project at the Make Ready printing factory. Our remit involved the installation of all electrical infrastructure. This significant undertaking required close coordination with the client, project architect and various other teams to ensure a successful outcome.
One of the primary challenges we faced was the need to integrate the electrical infrastructure into the factory’s existing architectural and mechanical systems. This required close collaboration with the design and construction teams to ensure our work was seamlessly integrated into the project plan.
Another challenge was the need to ensure that the electrical systems were both functional and aesthetically pleasing. This required careful planning and attention to detail to ensure we installed the containment and wiring visually appealingly whilst also complying with all relevant safety standards.
Overall, the project was a great success; we are proud to have played a role.